BLS12-381 Verification/8

Violin Plot

Violin Plot

This chart shows the relationship between function/parameter and iteration time. The thickness of the shaded region indicates the probability that a measurement of the given function/parameter would take a particular length of time.

BLS12-381 Verification/Groth16 process verifying key/8

PDF of Slope Regression

BLS12-381 Verification/Groth16 verify with processed vk/8

PDF of Slope Iteration Times

BLS12-381 Verification/Groth16 end-to-end verify/8

PDF of Slope Iteration Times

BLS12-381 Verification/BLST-based Groth16 process verifying key/8

PDF of Slope Regression

BLS12-381 Verification/BLST-based Groth16 verify with processed vk/8

PDF of Slope Regression